1 meeting and offer
At the beginning, we naturally need to get to know each other and talk about the entire
project. We need to know your wishes, expectations regarding the final result
but also regarding the course of the project and implementation. This way we can at least
roughly determine the timeline and which contractors we will need to find.
After that we can prepare an offer.
2 analysis of existing plans, site visit, measurements
A site visit follows, where we need to measure the project accurately, mark all
installations and all details so that nothing surprises us later. We photograph the project as much as possible and analyze the existing
condition. We talk to you again, this time more about individual rooms
and future life in them.
3 conceptual designs, floor plan, moodboard, references
After analyzing the existing condition, we prepare floor plan conceptual designs.
How many options there are depends on the project, but we prepare them based on
functionality, sensibility and your wishes and requirements. We also present
moodboard, reference examples and color combinations. Also presentation of
3d model and renders depends on the project, whether it makes sense already at the third meeting or in the next one. We wait for your response and decisions
to determine the final floor plan and spatial concept.
4 final layout, floor and tile selection
When we find the optimal floor plan layout and have the concept and 3d model developed
the selection of colors and materials follows. We start with the selection of floors,
parquet, tiles and also sanitary ware.
5 carpentry plan drawings and selection, proposals for serial equipment
At this stage when the furniture volumes are already determined we draw detailed
carpentry plans with all details and determined materials, colors,
handles and other details. Furniture that will not be made by carpentry
is searched for and proposed so that it can be ordered later.
6 installation drawings: water, electricity, lighting
Depending on the project, whether we prepare the installations from scratch or whether only
some changes are needed. We also help with lighting and lamp selection.
7 implementation
When we finally reach this point we regularly monitor the progress of the project implementation.
This does not mean that we are on the construction site every day, however we are prepared
for corrections, changes and observe that everything goes as we
planned.